
Road · Malaysia
The Bukit Tinggi climb is 5.5 km at 3.5% average from Bukit Tinggi, gaining 192 m to 644 m, with a steepest stretch of 6.8%. It is in Gombak, Kuala Lumpur, Malaysia. One published route climbs it, from 72 km.
5.5 km at 3.5% average from Bukit Tinggi, gaining 192 m to 644 m, 6.8% at the steepest.
Planning a trip around this climb?
Cycling in Gombak